a
Lorem ipsum gravida nibh vel velit auctor aliquetenean sollicitudin, lorem quis bibendum auci elit consequat ipsutis sem nibh id elit duis sed.
Monday - Friday 08:00 - 20:00

Saturday and Sunday - CLOSED

+ 0800 2466 7921

office@mikado-themes.com

34th Avenue

New York, W2 3XE

 

UCLE POOL STREET

A KIA Site Engineering Case Study

UCLE POOL STREET

Case Study

Project Details

Designed by architects Lifschuts Davidson Sandilands, UCL’s ambitious expansion programme to create a world class academic and research centre in the heart of Queen Elizabeth Olympic Park in East London. Once completed the finished structure will compromise of 5,500m2 of world leading academic research laboratories combined with two towers of 524 individual accommodation units housing the 4000 students who will study there.

Our Involvement

KIA’s Site Engineering surveyors have been involved in all aspects of the build, from providing and maintaining primary control stations to assisting Vinci’s own engineers in the inspection of reinforcement before each concrete pour. Using Leica’s TS16 total station we have provided our client with accurate setting out and as built information throughout the works, ensuring that all structural elements are positioned correctly.

CLIENT

University College London

PRINCIPAL CONTRACTOR

Vinci Construction UK Ltd

SERVICES

Dimensional Control, Engineering Surveying, Setting Out, As built surveys, Quality checks and inspections, Setting out of complex cladding, AutoCAD Services

DATE

2020